Skip to content
Lumora

EV charging

Charge the whole fleet overnight, without a bigger grid connection.

We install depot, workplace and visitor charging with load management built in, so vans, cars and trucks are ready by morning and your site stays inside the capacity it already has.

2,380
Charge points installed
22kW
AC per point, up to 400 kW DC
100%
Of sites with dynamic load management
24/7
Monitoring and remote reset from Rotterdam
01How it works

Where charging fits on your site.

Every system we build connects to the same switchboard, so solar, storage and charging are designed together, against one grid connection.

01

Every charger knows the site's limit

A meter at the main connection tells the chargers how much capacity is free, second by second.

02

Vehicles charge by departure time

Vans leaving at 06:00 charge before the ones leaving at 09:00. Nobody waits for a full battery they do not need.

03

Solar and storage come first

Chargers draw from the array and the battery before the grid, so daytime and evening top-ups cost less.

04

Drivers and costs, sorted

Driver cards, guest payment and home-charging refunds run through one back office, ready for your finance team.

02Who it suits

The sites that gain most.

If your site is on this list, a site assessment will usually find a system that pays for itself.

  • Logistics and warehousing

    Van and truck depots that need the whole fleet charged by the morning shift.

  • Manufacturing

    Staff car parks and on-site vehicles on a fixed connection.

  • Retail

    Visitor charging that brings customers in and keeps them a little longer.

  • Agriculture

    Electric yard vehicles and farm vans charged from the barn roof.

  • Education

    Staff and minibus charging on sites with tight grid connections.

03Key figures and specs

What we build, in numbers.

The ranges we design within. Your proposal names the exact equipment and why it was chosen.

AC charging
11 to 22 kW per point, Type 2
DC charging
50 to 400 kW, CCS
Load management
Dynamic, against the main connection, on every site
Scheduling
By departure time, state of charge and tariff
Protocol
OCPP 2.0.1, so chargers and software can change independently
Payment
Driver cards, guest card payment and home-charging refunds
Monitoring
Every session and every fault, with remote reset
04The process

Five steps, one team.

01

Fleet and site study

Routes, mileage, dwell times and the spare capacity on your connection.

02

Charging plan

How many points, how fast and where, phased with your fleet's replacement cycle.

03

Groundworks and power

Cabling, foundations and any switchboard upgrade, planned around operations.

04

Installation and set-up

Chargers, load management, driver cards and the reporting your finance team needs.

05

Support

Remote monitoring, a driver helpline and service visits from the nearest office.

05Related projects

Often not. Load management spreads charging across the night inside your current capacity. When a fleet outgrows it, solar and a battery are usually cheaper and faster than an upgrade.

Site assessment

Find out how many vehicles your site can charge today.

An engineer reviews your meter data and roof, visits the site and sends a written proposal with a design, a yield model and the financing options that fit. It costs nothing and commits you to nothing.