Logistics · Venlo, Netherlands · 2025

A distribution centre that runs its night shift on the afternoon sun

2.4 MWp on a 46,000 m² roof, with a 2 MWh battery for the evening peak.

N50 m

Site plan

Brightwater Logistics

Venlo, Netherlands

  • Solar array, 2,400 kWp
  • Battery, 2,000 kWh
  • Trees and planting kept
Completed
2025
Drawn by
Lumora engineering
System size
2,400 kWp
Yearly generation
2,230 MWh
Saved a year
€431,000
Payback
6.5 years
CO₂ avoided a year
870 t

01The challenge

Brightwater's cross-dock in Venlo runs two shifts and a night crew, with sorters, lighting and chargers for 60 reach trucks. Its grid connection was close to full, and the network operator quoted four years for an upgrade. The roof, 46,000 m² of new sheet metal, was doing nothing.

02What we built

We laid an east-west array across almost the whole roof, which spreads production over a longer day and fits more panels than a south-facing layout. Two battery containers take the afternoon surplus and release it from 18:00, when the night shift starts and grid prices rise. The battery also holds demand below the contracted peak, so the connection never needs to grow.

03The result

In its first year the site made 2,230 MWh and used 82% of it on site. Peak demand from the grid fell by a third, the upgrade request was withdrawn and the reach-truck fleet doubled inside the same connection.

04

How the project ran

1

Assessment

February 2024

Twelve months of meter data, the roof drawings and a site visit with Brightwater's facilities team.

2

Design and grid

March to June 2024

East-west layout, structural sign-off, battery siting and the network operator's approval.

3

Installation

September 2024 to January 2025

Built in four roof zones so loading and sorting never stopped. Switch-over on a Sunday.

4

Monitoring

From February 2025

Every string watched from Rotterdam. Controls retuned twice as the night shift grew.

The estimate we took to the board was within four per cent of what the roof produced in its first year.
Marieke Jansen, Facilities Director, Brightwater Logistics

Site assessment

A site like Brightwater Logistics's? Let us look at yours.

An engineer reviews your meter data and roof, visits the site and sends a written proposal with a design, a yield model and the financing options that fit. It costs nothing and commits you to nothing.