A school campus that teaches with its own power data
310 kWp across four buildings and 16 staff chargers, with live data in class.
Site plan
Skovbakke School Trust
Aarhus, Denmark
- Solar array, 310 kWp
- 16 charge points
- Trees and planting kept
- Completed
- 2025
- Drawn by
- Lumora engineering
- System size
- 310 kWp
- Yearly generation
- 295 MWh
- Saved a year
- €48,000
- Payback
- 5.9 years
- CO₂ avoided a year
- 115 t
01The challenge
Skovbakke's trust wanted to cut energy costs across its campus and give students something real to study. Its connection was too small for the staff chargers it had promised, and roofs could only be worked on in school holidays.
02What we built
We installed arrays on four buildings over two summer holidays, with chargers in the staff car park managed against the campus connection. A display in the science block shows the live output, and teachers get the raw data for lessons.
03The result
The campus makes 295 MWh a year. The chargers run within the existing connection, and two year groups now use the system's data in maths and physics.
How the project ran
Assessment
March 2024
Four roofs, the campus connection and the staff travel survey.
Design
April to June 2024
Holiday-only build plan, charger layout and the data feed for teachers.
Installation
July 2024 and July 2025
Two summer holidays, two buildings each, no work during term.
Monitoring
From August 2025
Live display in the science block, with yearly data sent to the trust.
The students check the display before the weather forecast now.