Is your roof ready for solar? Five checks before a survey

Most commercial roofs can carry an array. These five checks tell you early if yours needs work first.

Jonas Brandt

Chief Technical Officer ·

A solar array will sit on your roof for 25 years or more. Before anyone designs one, it is worth knowing whether the roof will last that long and whether it can carry the load. These are the five things our engineers look at first. You can check most of them yourself.

1. Age and condition

If the roof covering is due for replacement within ten years, replace it first. Lifting and refitting an array costs far more than doing the roof before installation. Look for ponding water, blistering on bitumen roofs and corrosion on sheet metal, and find out when the roof was last renewed.

2. Structure and load

A ballasted east-west system on a flat roof adds 12 to 20 kg per square metre. Most warehouses built after 2000 have that margin; older buildings and lightweight roofs may not. The original structural drawings answer the question quickly, so find them before the survey if you can.

3. Shading and obstacles

Rooflights, plant, parapets, chimneys and neighbouring buildings all cast shade. Shade on one panel can pull down a whole string, so we model every obstacle over a full year. A roof full of rooflights still works; it just carries fewer panels.

4. Access and fire safety

Installers need safe access, and fire services need clear routes across the roof and isolation points they can find. We design walkways and keep distances from fire walls and smoke vents. Your insurer may have its own rules, so tell them early.

5. Electrical room and grid connection

The array connects into your main switchboard. We check that the board has space and capacity, and that your grid connection can accept the power you will export at midday. Where it cannot, a battery or export limit solves it.

Written by

Jonas Brandt

Chief Technical Officer

Request a site assessment
All insights
  • Finance

    14 September 2026 · 3 min read

    How to read a solar payback figure

    The number your board asks for first hides four choices. Here is how to check each one before you sign.

    Sanne Bakker, Chief Financial Officer

  • Storage

    2 September 2026 · 3 min read

    Battery storage and peak shaving, explained

    Why one fifteen-minute spike can set your bill for a month, and how a battery takes it off the grid.

    Agnieszka Nowak, Managing Director, Poland

  • Charging

    19 August 2026 · 3 min read

    Charging a van fleet at the depot

    Start from routes and dwell times, not from the charger catalogue. Most fleets need far less power than they fear.

    Daan Visser, Head of E-mobility

Site assessment

Find out what your roof could do.

An engineer reviews your meter data and roof, visits the site and sends a written proposal with a design, a yield model and the financing options that fit. It costs nothing and commits you to nothing.